Another day of bending, placing, and tying rebar… lots and lots of rebar. About half of the east wall (right of video) and a good amount of the theater room have the lower cage in place. After all of the lower rebar is in place in the footing excavations, we still need vertical rebar for the wall and a top horizontal bar for the footings.