The drain pipe for the low-point in the theater was placed in the trench that was laid yesterday and the trench was back-filled. The slope on the north east side of the theater (top right of video) was corrected and the driveway slope (top left) was made usable.

After lunch, the electric company finally showed up to move the overhead power lines to underground. I know, AMAZING! After they were done, the pole was taken down and the grade was fixed where we had been leaving a mound of dirt to support the pole. After the grade was fixed, the crew started the placing the lagging in the two 6ft spans that were obscured by the pole.