The rest of the dirt from the theater, driveway, and basement grade was moved to the back yard – so it can be used as back-fill dirt when the basement walls are done – but, two additional truckloads needed to be taken away. At this point, the basement grade is level, the theater cuts are done, and the driveway ramp is almost complete.

Dirt export truck-load total: 242 loads.