The initial driveway slope was created, mostly to allow the mini-excavator and bobcat to go up it, the steps in the theater were completed, the shoring between the basement and driveway was back-filled, and the excavated grade was leveled. Most of the excess dirt was moved to the backyard area (bottom right of the video) so that it can be used to back-fill the rear basement wall once the wall is in place … otherwise there we would spend a few weeks with wheelbarrows moving dirt.