The shoring/excavation/concrete contractor switched crews today from the excavation guys to the concrete guys! This means that we have officially started work on the foundation. The new crew spent about half the day getting their bearings, pulling strings, taking elevations, etc. The second half of the day was spent excavating the steps in the theater room and starting the shoring between the theater room and the driveway (top left of video).