The last 6 perimeter piles were completed today, leaving us with just the 6 interior piles that keep the east side of the driveway slope from falling in to the basement. The site was prepared for the 6 interior piles and each pile was marked with a pin in the ground. The forecast calls for rain tomorrow, which means the last 6 might be delayed…

On a positive note, the electric company planner contacted me today and said the drawings for the neighbors underground utilities should be completed and approved by mid week (Wednesday?) – although, I’m not going to hold my breath.