Piles were drilled, beams were dropped, and concrete was filled for another 12 piles today, leaving 6 along the west property line for Monday and the 6 interior piles (between the driveway and the west wall of the basement) for Tuesday… Three days before I expected the piles to all be in!

The drilling company brought out a really cool custom made drill rig today that only requires 8ft of overhead clearance and can drill a 3ft hole 85ft deep. The rig was on site for about two hours to drill the pile closest to the utility pole.