More preparations for the drill rig today, mostly on the east side of the property (right side of the video), although some work was done on the west side where portions of the hedge on the north-west corner of the property (top left of video) were removed to make way for two pylons.

The neighbor’s houses (to the west) were also measured for their new underground electrical panel, phone, and cable boxes and the required materials were purchased. We hope to be able to swap out their panels early next week so that all of the work that physically touches the houses is done by the time the electric company finally provides the underground conduit routing plans. I’m sure you are all shocked that we are still waiting for the electric company (no pun intended).