After meeting with the demo/shoring/excavation/concrete contractor in the morning (Jason), he agreed that the existing 100 year old retaining walls need to be replaced. Jason’s second in command, Jeff, came back to survey the situation. Details of the existing conditions have been sent to the civil engineer so that he can determine what will be required.

Not a whole lot to see today, but as always – the time-lapse is below.